General repair of the URBAS 4.5 MW boiler lining

The Alfa Heat CZ team was overhauling a 4.5 MW wood chip boiler in the municipal heating plant in Bystřice nad Pernštejnem.

The Alfa Heat CZ team during the overhaul of the URBAS boiler lining
General repair of the URBAS boiler lining
General repair of the URBAS 4.5 MW boiler lining